Home
Operations
Fallen Flags
E&P Blog
Links
Easton & Potomac
RAILROAD
History
Golden Spike
TOWNS
Broadway
Brooke
Flat Top
Furnace
Hood
Hopkins Spring
Lacey Springs
Stanley
Swift Run
Thorny Point
White Hall
LAYOUT
Layout Room
Specifications
Construction Photos
Latest Picture
OPS Photos
Comments
Easton & Potomac
(OP sessions start with lunch at 11:30, first train leaves around 12:30 and the sessions end around 4:00.)
(Space is limited to eight on a first-come first-served basis.)
Assigned
Crews
Fully Qualified
Operators (FQO)
Past Attendance
Position Summaries
OPS Photos
Request a position at any of the OPS sessions below
Name:
Email:
I have not operated on the E&P.
March 20, 2010
April 17, 2010
June 19, 2010
July 17, 2010
August 21, 2010
September 18, 2010
November 20, 2010
December 18, 2010
Preferred Position:
Engineer
Thorny Point YM
Asst. White Hall YM
White Hall YM
Tower Operator
Dispatcher
Any
Preferred Position:
Engineer
Thorny Point YM
Asst. White Hall YM
White Hall YM
Tower Operator
Dispatcher
Any
Preferred Position:
Engineer
Thorny Point YM
Asst. White Hall YM
White Hall YM
Tower Operator
Dispatcher
Any
Preferred Position:
Engineer
Thorny Point YM
Asst. White Hall YM
White Hall YM
Tower Operator
Dispatcher
Any
Preferred Position:
Engineer
Thorny Point YM
Asst. White Hall YM
White Hall YM
Tower Operator
Dispatcher
Any
Preferred Position:
Engineer
Thorny Point YM
Asst. White Hall YM
White Hall YM
Tower Operator
Dispatcher
Any
Preferred Position:
Engineer
Thorny Point YM
Asst. White Hall YM
White Hall YM
Tower Operator
Dispatcher
Any
Preferred Position:
Engineer
Thorny Point YM
Asst. White Hall YM
White Hall YM
Tower Operator
Dispatcher
Any
Comments: